Projects in roads infrastructure

No.

Project name

Beneficiary

Implementation period

Project value

Donor/ development partner

INFRASTRUCTURA DE TRANSPORT

1.

R1 Chi╚Öin─âu – Ungheni – Sculeni, km 6+446 – km 24+050

Î.S. „Administra╚Ťia de Stat a Drumurilor”

08.07.2014- 20.11.2016

23 111 340.27 EURO

BEI

2.

R1 Chi╚Öin─âu – Ungheni – Sculeni, km 24+050 – km 68+250

Î.S. „Administra╚Ťia de Stat a Drumurilor”

30.07.2014- 18.11.2016

27 088 492.81 EURO

BEI

3.

R1 Chi╚Öin─âu – Ungheni – Sculeni, km 96+200 – km 103+913

Î.S. „Administra╚Ťia de Stat a Drumurilor”

30.07.2014- 03.12.2016

10 730 899.4 EURO

CE FIV

4.

R1 Chi╚Öin─âu – Ungheni – Sculeni, km 74+177 – km 96+200

Î.S. „Administra╚Ťia de Stat a Drumurilor”

07.11.2014- 06.11.2016

15 065 241.04 EURO

BERD

5.

R33 Hînce╚Öti – L─âpu╚Öna – M1, km 0+000 – km 37+200

Î.S. „Administra╚Ťia de Stat a Drumurilor”

03.11.2014- 02.11.2016

18 772 996.0 EURO

BERD

6.

R16 B─âl╚Ťi – F─âle╚Öti – Sculeni, 1 sect. km 4+800 – km 30+270; 2 sect. km 30+270 – km 59+480

Î.S. „Administra╚Ťia de Stat a Drumurilor”

05.02.2016- 04.02.2019

50 599 020.54 EURO

BEI

7.

R1 ocolirea Bahmut, km 68+250 – km 74+177

Î.S. „Administra╚Ťia de Stat a Drumurilor”

10.05.2018- 09.05.2021

5 325 090.37 EURO

CE FIV

8.

M3 Porumbrei – Cimi╚Ölia km 0+000 – km 19+010

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019 - 2022

29 903 744.46 EURO

BEI

9.

M3 ocolirea Comrat, km 0+000 – km 18+263

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019 - 2022

29 497 220.74 EURO

BEI

10.

M3 Chi╚Öin─âu – Giurgiule╚Öti, km 96+800 – km 122+800; km 122+800 – km 151+200; km 151+200 – km 171+290; km 179+650 – km 190+750.

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2022

29 932 873.89 EURO

BERD

11.

Construc╚Ťia drumului de ocolire M3 Slobozia Mare km 0+000 – km 18+290

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019 - 2022

18 284 398.77 EURO

BERD

12.

Reabilitarea drumului M2 – ocolirea Mun. Chisinau, km 0+000 –km 6+550

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019 - 2021

9 917 975.17 EURO

BEI

13.

Reabilitarea drumului R6 Chisinau-Orhei-Balti 1 sect: km 99+530 – km 111+230 2 sect: km 76+700 – km 94+700 ╚Öi podul de la km 72+944

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2022

36 003 933.09 EURO

BERD

14.

Reabilitarea drumului R34 Hînce╚Öti – Leova – Cahul, km 0+000 – km 83+000

Î.S. „Administra╚Ťia de Stat a Drumurilor”

24.08.2020 - 25.02.2023

56 495 268.42

BERD

15.

Supervision of Construction Works on R1 Bahmut bypass, km 68+250 – km 74+177 / Rendel Limited (UK)

Î.S. „Administra╚Ťia de Stat a Drumurilor”

10.05.2018- 09.05.2021

1 323 100.0 EURO

CE FIV

16.

Supervision of Construction Works on R1 Chi╚Öin─âu – Ungheni – Sculeni, km 6+446 – km 24+050, km 24+050 – km 68+250, km 74+177 – km 96+200 WSP Group SRL in association with Tecnic Consulting Engineering Romania

Î.S. „Administra╚Ťia de Stat a Drumurilor”

08.07.2014- 20.11.2016

5 444 220.99 EURO

BEI

17.

Supervision of Construction Works on R33 Hînce╚Öti – L─âpu╚Öna – M1, km 0+000 – km 37+200 / SPEA Engineering Spa (Italy)

Î.S. „Administra╚Ťia de Stat a Drumurilor”

03.11.2014- 02.11.2016

2 312 850.0 EURO

BERD

18.

Supervision of Construction Works on R1 Chi╚Öin─âu – Ungheni – Sculeni, km 74+177 – km 96+200/ SPEA Engineering Spa (Italy)

Î.S. „Administra╚Ťia de Stat a Drumurilor”

07.11.2014- 06.11.2016

2 144 208.0 EURO

BERD

19.

Supervision of Construction Works on R16 B─âl╚Ťi – F─âle╚Öti – Sculeni, 1 sect. km 4+800 – km 30+270; 2 sect. km 30+270 – km 59+480/ Louis Berger (France)

Î.S. „Administra╚Ťia de Stat a Drumurilor”

05.02.2016- 04.02.2019

2 999 176.0 EURO

BEI

20.

Supervision of Rehabilitation of M3 Chisinau – Giurgiulesti Road, km. 96+800 – km. 171+290 and km. 179+650 – km. 190 + 750 / EPTISA Servicios de Ingenieria S.L. in association with EPTISA Romania S.R.L. and TEMELSU International Engineering Services Inc.

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2022

2 431 150.0 EURO

BERD

21.

Supervision of Rehabilitation of M3 Porumbrei – Cimi╚Ölia km 0+000 – km 19+010 and M3 ocolirea Comrat, km 0+000 – km 18+263 / EPTISA Romania S.R.L. in association with EPTISA Servicios de Ingenieria S.L. and TEMELSU International Engineering Services Inc.

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2022

3 053 700.0 EURO

BEI

22.

Supervision of Rehabilitation of M3 Slobozia Mare km 0+000 – km 18+290 / IRD Engineering SRL

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2022

2 200 000.0 EURO

BERD

23.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 11, Contractul 2: LRIP/W3/02: L314 Drum de ocolire a S. Izbi╚Öte, km 15+390 – km 19+810 ╚Öi Drum L314 M2- Peresecina-Hirtopul Mare- Ohrincea km 19+810 – km 24+300

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2020

63 355 424.99 MDL

Banca Mondial─â

24.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 11, Contractul 1: LRIP/W3/01: L313 M2- Drum de acces spre satul Micle╚Öti km 0+000 km 5+000 ╚Öi Drum L314 M2- Peresecina-Hirtopul Mare- Ohrincea km 1+640 – km 15+390

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2020

99 875 975.99 MDL

Banca Mondial─â

25.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 13, Contractul 2: LRIP/W4/02: Drumul L390 Pîrli╚Ťa-Nisporeni, km 10+900 – km 23+400

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2020

97 562 417.73 MDL

Banca Mondial─â

26.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 13 în cadrul Contractului LRIP/W4/03: Drumul L390 Pîrli╚Ťa – Nisporeni, km 23+400 – km 32+942

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2020

70 974 287.83 MDL

Banca Mondial─â

27.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 13 în cadrul Contractului LRIP/W4/04: Drumul L431 Paruceni – Seliste – Vinatori, km 0 + 000 – km 4+ 200 ╚Öi R25 drumul de acces c─âtre s. Seli╚Öte, km 0 + 000 – km 3 + 600

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019-2020

73 073 399.95 MDL

Banca Mondial─â

28.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 13 în cadrul Contractului LRIP/W5/04: Drumul L390 Pirlita – Nisporeni, km 0 + 000 – km 10+900

Î.S. „Administra╚Ťia de Stat a Drumurilor”

21.09.2020 – 23.03.2022

84 184 919.25 MDL

Banca Mondial─â

29.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 8.3 în cadrul Contractului No. LRIP/W2/02: Drumul L405, R21 – Oniscani, km 0+000 – km 9+962

Î.S. „Administra╚Ťia de Stat a Drumurilor”

18.09.2019 – 18.03.2021

88 289 715.59 MDL

88 289 715.59 MDL

30.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 10 în cadrul Contractului LRIP/W5/01: Drumul G46: Dobrusa – Ignatei – Scorteni – Codrul Nou – R14, km 22+610 – km 29+200

Î.S. „Administra╚Ťia de Stat a Drumurilor”

28.09.2020 – 29.03.2021

103 729 144.73 MDL

Banca Mondial─â

31.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 10 în cadrul Contractului LRIP/W5/02: Drumul G46: Dobrusa – Ignatei – Scorteni – Codrul Nou – R14, km 15+760 – km 22+610

Î.S. „Administra╚Ťia de Stat a Drumurilor”

28.09.2020 – 29.03.2021

150 121 517.07 MDL

Banca Mondial─â

32.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 10 în cadrul Contractului LRIP/W5/03: Drumul G49: G47 – Peciste – Trifesti – R20, km 0+000 – km 11+426

Î.S. „Administra╚Ťia de Stat a Drumurilor”

28.09.2020 – 29.03.2021

110 257 600.92 MDL

Banca Mondial─â

33.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 16 în cadrul Contractului LRIP/W6/01: Drumul G105: R3 – Costesti – Tipala – G106, km 0+000 – km 8+450

Î.S. „Administra╚Ťia de Stat a Drumurilor”

12.01.2020 – 06.02.2022

98 435 373.58 MDL

Banca Mondial─â

34.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 16 în cadrul Contractului LRIP/W6/02: Drumul G105: R3 – Costesti – Tipala – G106, km 8+450 – km 17+350

Î.S. „Administra╚Ťia de Stat a Drumurilor”

12.01.2020 – 06.02.2022

94 947 821.0 MDL

Banca Mondial─â

35.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 16 în cadrul Contractului LRIP/W6/03: Drumul G105: R3 – Costesti – Tipala – G106, km 17+350 – km 26+400

Î.S. „Administra╚Ťia de Stat a Drumurilor”

12.01.2020 – 06.02.2022

81 831 658.02 MDL

Banca Mondial─â

36.

Lucr─âri de îmbun─ât─â╚Ťire a Coridorului 16 în cadrul Contractului LRIP/W6/04: Drumul G105: R3 – Costesti – Tipala – G106, km 26+400 – km 34+584

Î.S. „Administra╚Ťia de Stat a Drumurilor”

12.01.2020 – 06.02.2022

87 963 811.12 MDL

Banca Mondial─â

37.

Supervision of LRIP projects/ Joint Venture TECNIC consulting Engineering Romania SRL in association with HILL International N.V. and Swedish National Road Consulting AB

Î.S. „Administra╚Ťia de Stat a Drumurilor”

2019 - 2020

1 205 920,0 EURO

Banca Mondial─â